Announcement of curtailment on TR-GR border direction for 03-07.05.2024

Based on instructions from TEAIS and IPTO, SEE CAO announces that NTC on TR<->GR border direction will be curtailed for period 03-07.05.2024 in order to ensure operation remains within Operational Security Limits. The curtailment is requested due to extremely low demand which leads to lack of reserve, low system inertia conditions and as a result requires a minimum number of power plants on the grid.

Curtailment will be performed two days before each delivery day (D-2) at 11h.

Hourly NTC values for the days of concern are enclosed.